Hatim EL BAKRI

πŸ“ Pamplona, Spain ⚑ Immediate availability 🟒 Open to work

Building and deploying AI-powered solutions πŸš€ Deep learning, MLOps pipelines, and cybersecurity, from notebooks to production πŸ”

πŸ”¬ View projects πŸ‘‹ Say hello
⚑

Technical toolkit

Core skills powering every project, from data wrangling to cloud deploy.

🧠 Python πŸ”₯ PyTorch πŸ“Š TensorFlow πŸ” scikit-learn πŸ“ˆ pandas πŸ”’ NumPy πŸ“‰ Matplotlib 🎨 Seaborn 🐳 Docker πŸ“¦ MLflow πŸ”„ DVC 🍱 BentoML βš™οΈ GitHub Actions ☁️ AWS 🌐 Azure πŸƒ MongoDB 🐬 MySQL β˜• Java 17 🌱 Spring Boot 🌢️ Flask πŸ”Œ REST API πŸ“± Streamlit
πŸ”¬

Latest projects

Applied ML work in MLOps, computer vision, and NLP.

MLOps dashboard with anomaly detection
πŸ›‘οΈ
MLOps Pipeline

Network Security Anomaly Detection

Full MLOps pipeline: ETL, data validation, experiment tracking with MLflow, batch prediction, and automated deployment to AWS.

MongoDB Atlas MLflow Docker GitHub Actions AWS
View on GitHub β†’
Satellite imagery grid with classification
πŸ›°οΈ
Computer Vision

EuroSAT Satellite Classification

Custom CNNs vs. fine-tuned ResNet18 on multispectral satellite imagery. Evaluated augmentation and normalization strategies.

PyTorch CNN ResNet18 Transfer Learning
View on GitHub β†’
Neural attention mechanism visualization
🌍
NLP

French-English Neural Translation

Comparative study of NMT architectures: stacked LSTMs to Bi-GRU with Bahdanau attention. Deployed live on Streamlit.

PyTorch spaCy Bi-GRU Attention Streamlit
View on GitHub β†’
πŸ’Ό

Experience

From AI training to full-stack engineering.

πŸ‘οΈ
Oct 2025 - Present

AI Trainer / QA Controller

Invisible Technologies - Remote (USA) πŸ‡ΊπŸ‡Έ
  • QA and root-cause analysis on large-scale AI datasets, detecting anomalies and tracing data-integrity issues
  • Defined system behavior with cross-functional teams, translating requirements into accuracy criteria
πŸ€–
Sep 2024 - Dec 2024

Backend Developer (Java)

F5C Industrie - Remote (Morocco) πŸ‡²πŸ‡¦
  • Built a production AI chatbot backend with Java 17 + Spring AI, integrating OpenAI API
  • Reduced system latency by 30% via caching and payload optimization 🏎️
🏒
Jun 2024 - Sep 2024

Full-Stack Developer (Java/React)

Wafa Assurance - Casablanca, Morocco πŸ‡²πŸ‡¦
  • Configured Zabbix monitoring and ran integration tests with Jetty for production stability
  • Developed insurance simulation engine with Spring Boot + modular REST API
πŸŽ“

Education

πŸ‡ͺπŸ‡Έ

Dual Master's in Computer Engineering and Cybersecurity

UPNA - Pamplona, Spain
In progress ⏳
πŸ‡«πŸ‡·

Bachelor's in Web and Mobile Development

ULCO - Dunkerque, France
2024 βœ…
πŸ‡²πŸ‡¦
Arabic / French
Native
πŸ‡¬πŸ‡§
English
C2 (EF SET)
πŸ‡ͺπŸ‡Έ
Spanish
B2 (SIEL)
βœ‰οΈ

Let's connect

Available for Data Science roles. Let's build something cool together 🀝

πŸ“§
πŸ“±
Phone
(+34) 604 200 294
πŸ“
Location
Pamplona, Spain
🌐